I am a resident of lingarajapuram 10th cross. Bwssb is laying new drainage pipeline on 9th cross and 10th cross.
On enquiry with bwssb i found that the residents do not have to make any payment to the contractor for reconnecting the drainage. However, the bwssb contractor has collected a sum ranging from rs.4000 to rs.16000 for reconnecting the drainage from each house, inspite of instructions to the contrary from bwssb. I request bwssb to take note of this and refund the amount to the residents.
Bob m Was this information helpful? |
area: kengeri upanagara
vinayaka nagara.