Dear sir,
The valve man named vikram who from the time of him being appointed to our area has never let water to 18th main of our road the dead end.
Always he opens water later at 8:30 a. M. And closes almost at 10:15 a. M.
We resident protested on 17-2-18 against this when he came. We asked him to call up some responsible person to solve our case. He did drama of telephoning someone and went off. Later on 19th and 21st i. E. Today still he has not opened water fully and we are suffering.
Today he did another game plan. He came over at around 1:00 p. M. And has put some cement inside the valve hole and started doing dramas telling that some people who are residing down has put the cements.
At one p. M. I saw him standing near the valve for a long time doing something and went to enquire and i saw all the cement was as if mixed just at that time only. It was wet. He bought some old man named govinda and made him to remove it. He removed it by hand easily. For no reason the old man govinda was shouting at me which all points out that he could be the one who has brought the cement.
His version is someone at night filled the cement. If someone at night had filled it, it could never be easy to remove it. It could have got dried up. Nowadys cement dries up quickly. He is playing all types of games now having grudge on some people who have refused to give money to him in 18th main.
Some responsible engineers from water department has to visit our area immediately to inspect and should see to it water is sufficiently available to all. Water, when opened people in down area fill their tanks which too is insufficient and the upper area people, do not get water.
Please do the needful at the earliest within the next water opening day.
Bhaskaran, advocate
No.66/a, 18th main, jc nagar, bangalore - 560086 Was this information helpful? |
Post your Comment