I the undersigned am resident of 2075, Mukeem Pura, Subzi Mandi, Delhi-110007 and having a complaint regarding problems due to incomplete and defective construction of street Road. Just few months back our area has issued a contract for construction of cemented road. The contractor has not even constructed the Road and repair the drainage system (Nala) on both side of the road. What contractor did is purely eye wash.
For the last approximately 10 months construction of open gatar and street road/Sewerage system in front of our houses was going on causing hell of problems to us. Apart from the fact that the patches have been left open incomplete:
2. Apart from the above, the gatar slope (Levels) are irregular. We have never seen anyone measuring levels/gradient/slop of these gatars. That’s why many residents has forcefully closed the drainage system in front of there home, leaving the others life in danger.
3. No MCD workers has been even tried to open the drainage system, with charging the culprits.
4. Now being monsoon there is more danger. Drainage system is not proper and the road is completely damaged and our living conditions are so bed due to water lodging in streets.
5. Due to uneven levels the water is stinking and mosquitoes have been increased posing threat to life.
6. May I request you to look into this matter seriously and save us from life long problems?
We sincerely request you to ask the said officer or any other concerned authority, which so ever is responsible to immediately corrects the faults and complete the project without any further delay and damage.
Pooja
[protected]
For the last approximately 10 months construction of open gatar and street road/Sewerage system in front of our houses was going on causing hell of problems to us. Apart from the fact that the patches have been left open incomplete:
2. Apart from the above, the gatar slope (Levels) are irregular. We have never seen anyone measuring levels/gradient/slop of these gatars. That’s why many residents has forcefully closed the drainage system in front of there home, leaving the others life in danger.
3. No MCD workers has been even tried to open the drainage system, with charging the culprits.
4. Now being monsoon there is more danger. Drainage system is not proper and the road is completely damaged and our living conditions are so bed due to water lodging in streets.
5. Due to uneven levels the water is stinking and mosquitoes have been increased posing threat to life.
6. May I request you to look into this matter seriously and save us from life long problems?
We sincerely request you to ask the said officer or any other concerned authority, which so ever is responsible to immediately corrects the faults and complete the project without any further delay and damage.
Pooja
[protected]
mangol puri m thany walay road par nalay ka repairing cal raha hai nalay m pani ur dust pada hai pahlay pani ur dust niklwai phir repair karway thank you
11%
Complaints
12483
Pending
0
Resolved
1410
+91 11 2652 2700
Dr. S.P.M. Civic Centre, Minto Road, New Delhi, Delhi, India - 100002
MCD — delay in construction of street
Sir,It is informed you that the street no. 244, Hansa Puri, Tri Nagar, Delhi -35 was broken by the your Deptt for the purpose of reconstruction of the same but even after a month, the street has nither re-constructed nor repaired till date. the condition of the street in front of ours houses becomes worst and we are not even able to move properly in the street. Even no vehicle can enter in the street.
You are requested to kinly look into the matter and do the needful under intimation to me at an early.
Yours faithfully
Mukesh Kumar
On behalf of the Residents of Street No. 244.
Hansa Puri, Tri Nagar, Delhi.