Sir,
Resi.Pkt-3, sec- a-9, narela delhi
The reason every time long power cuts every day 4 to 5, 8 to 9 and midnight any time, Why cuts are there in midnight and no any where place in narela power cut so why power cut in sec. pkt- 3, A 9 dda pls solve this problum as soon as posible.
thanks
Resi.Pkt-3, sec- a-9, narela delhi
The reason every time long power cuts every day 4 to 5, 8 to 9 and midnight any time, Why cuts are there in midnight and no any where place in narela power cut so why power cut in sec. pkt- 3, A 9 dda pls solve this problum as soon as posible.
thanks
NORTH DELHI POWER LIMITED — request for new connection 0910873642
i have applied for a new connection at my premises which is owned by me. the reques no. is [protected] dated 09.01.2010. the department had not made any contact to us. after few days when we enquired about the request they asked me to meet CGO at Keshav Puram because your premises have some dues. i met CGO on 25.01.2010. He was satisfied. After three/four days when i enquired they asked me to meet CRO at badli because dues are outstanding in the name of Anil Gupta. i met him on 06.02.2010. but even after that much efforts the customer care executive asked me to meet the CRO to foreward the mail. I am not in the capability to attend the department so many times. please see in the matter & oblidge.NORTH DELHI POWER LIMITED — meter shifting
I had requested to NDPL to shift meter vide request No. [protected] and an amount of Rs. 1600 has been deposited on 14.12.10 but till date they did not shift my meter. I m faing problem a lot. Kindly do the as early as possible.Regards:
S.K.Jain
[protected]
had requested to NDPL to shift meter vide request No. [protected] and an amount of Rs. 600 has been deposited on 9.10.12 but till date they did not shift my meter. CA No [protected] I m faing problem a lot. Kindly do the as early as possible.
Regards:
Regards:
Some light not working till date due to connection can not touch to usal line kindly check in