Municipal Corporation Of Delhi — Bad road condition, dug up and left unusable
A
A 1
Dec 2, 2020
Address: Street Number 9, Block E, Shyam Vihar Phase-1, Najafgarh, Delhi, 110043, India
Hi,
The road (Street No. 9) in front of my house located in Shyam Vihar, Phase 1, Najafgarh was dug up for construction of new Nali and has been left unrepaired for over two months now. The ramp of my house entry was broken by the contractor and heavy stones and soil thrown on the road but not labelled yet. The road is now non motorable and not even in a walkable condition.
Please help.
+1 photos
Was this information helpful?
No (0)
Yes (0)
Municipal Corporation of Delhi customer support has been notified about the posted complaint.
Municipal Corporation of Delhi Complaint Status Update [ID: 2765828]
Hi,
My complaint is still unattended and unresolved.
It has almost been 3 months now that the road in front of my house has been dug up and left un-repaired.
We cannot even open our front gate fully as the same is obstructed by a large piece of concrete left on the road.
The contractor seems oblivious of the hardship we are facing every day, being not able to use our vehicle to commute safely in these times of corona pandemic.
Further the dust on the street is adding to the air pollution in our locality.
Even on the other roads nearby that were recently constructed there is dust scattered on both sides adding to the air pollution.
Can MCD please look into this on priority and order the contractor to complete the road please?
Customer satisfaction rating Customer satisfaction rating is a complex algorithm that helps our users determine how good
a company is at responding and resolving complaints by granting from 1 to 5 stars for each
complaint and then ultimately combining them all for an overall score. Read more
Hi,
My complaint is still unattended and unresolved.
It has almost been 3 months now that the road in front of my house has been dug up and left un-repaired.
We cannot even open our front gate fully as the same is obstructed by a large piece of concrete left on the road.
The contractor seems oblivious of the hardship we are facing every day, being not able to use our vehicle to commute safely in these times of corona pandemic.
Further the dust on the street is adding to the air pollution in our locality.
Even on the other roads nearby that were recently constructed there is dust scattered on both sides adding to the air pollution.
Can MCD please look into this on priority and order the contractor to complete the road please?