Address: Street no. 4 Balbir Nagar Shahdara Delhi 110032 |
The first submission is that the entire construction of our street is still incomplete, which started from 19/10/2020, saying that we will complete this work by the end of this month, but the people on the other side of the street are not due to some archno. It should not be made to make a drain by saying that it should never be made by saying that the street should be built at the same level because the level of their house is connected to the ground and the rain leads to water logging at home and that is why it is going to meet the road maker who is going to work. On the other hand, when the police came and broke the house of the people who were putting an arche in the road work. But after a lot of talk, the road maker assured that we will complete the street before Diwali (November 14). But after making a half-baked street, they left the street and did the work of those who were putting an opportunity in the work. Which is not good at all and shows on some sides because the work was done quickly by giving vip tags and money to those who stopped the work. Is it true and whether this work is done in the same way, still in the governments conscience? Now, this is the request of the people of half the street to expedite this work. Because the people are having a lot of trouble in coming, the elderly people are not only walking on this road and the street children have been hurt many times by falling on the road, if the street is not done at the earliest, we will also stop the peoples awa-jhavi from the other end in the street after 21st November, where the work is halted.
Thank you.
A resident of the street.
Was this information helpful? |