Dear sir/madam,
It is to informed you that pspcl office sarai amant khan officials are not handling our request to change 1 phase meter to 3 phase meter. Our axis bank gandiwind branch meter no is gw241401f should be replaced with 3 phase meter.
Branch is alloted 8 kv load and there is a lot of fluctuation in electricity due to single phase meter which will result in a big loss of electricity server, ups and air conditioners.
We are approaching pspcl office sarai amant khan from last 20 days to change meter. We submit request letter two times, but they are very stubborn and ignoring our request.
Kindly do the needful so that our branch meter gets replaced on urgent basis Was this information helpful? |