Address: Ludhiana, Punjab, 141401 | Website: PSPCL Khanna |
I would inform you that i had already brought to the notice of the sdo of city-2, khanna (Punjab) that after switching of the main connection of the building where no person is residing and the building is kept in lock for more than eight months but the bill of electricity being consumed is being sent by the electricity board (Pspcl). This started happening when the meter have been taken out of the premises and installed on the poles in the street.
That when the main switch is closed or no electricity is being consumed than another meter of another resident is being showing closed but my meter in the name of amrik singh s/o avtar singh, amloh road, khanna whose consumer number is k34kh553184w contract a/c no [protected] is showing working and after every two months a heavy bill is being generated to be paid. Few bills have already being paid on assurance that they would be corrected and refunded but nothing happens. Hence you are requested to get it inspected and get the meter in the box (Set of four meters) to be checked and if their is any fault in wiring connection made by the contractor who had installed meter on poles than the bill should be corrected from the date when the meter was installed on the pole and refund should be made immediately. Was this information helpful? |
The receipt for the above payment is not generated and bill is shown pending.