Address: Bathinda, Punjab, 151001 |
Sir, with respect i submit that i have an three phase meter at my residence having account no. [protected]. My electric meter is a three phase meter. Out of the three phase, two terminal of the meter is not working due to electric shock damage. Only one phase is working. So in this regard i requested the local authorities and they advise me to deposit to meter replacement charges. So i deposited the charges rs.1920/- on date 13.09.2017 vide receipt no[protected]. But till date my meter has not been replaced. I have requested many timed to the local authorities they always says that there is meter shortage. So request you to look into the matter so that my meter may please be replaced at the earliest. Was this information helpful? |
Post your Comment