Address: HARAIPUR, JAUNPUR, 222002, Varanasi, Uttar Pradesh |
The account no.[protected] of late dhanawatti devi having service connection no.[protected]. The above connection was used as an agricultural purpose but the bill was raised in the year 2016 for rs. 60000 approx and line was disconnected without giving any notice.
Though we have objected for the commercial rate but we have told to pay atleast 50% for reconnection as that time rabi season was prevalling. We have paid rs. 30500 on 19/11/2016 wide receipt no 765559 and we requested the sdo kerakat to rectify to agriculture code. He ordered to get field report from assistant engineer. He inspected my 3hp submersible pump and given report to sdo kerakat.
No rectification is done as yet though 36 months has passed but the bill was charged as per commercial rate.
And now it comes to 115000 approx as on 30/11/2019.
I again approched sdo kerakat on 9/12/2019 to modify to agriculture code the sdo asked for field report from mr. Gajanan chowdhury (Jr. Engineer) under chandawak power house. He confirmed and written that consumer had installed 3hp submersible for agriculture purpose and letter was duly signed by him on 11/12/19 and the same letter was forwarded by sdo kerakat. And the same letter was submitted by me to hxn of jaunpur room no.3 on 12/12/19. He assured me for the rectification but till today bill is still coming as per commecrial rate i;e rs 1513.60 monthly totalling to rs 125000 approx.
I request your goodself to look into the matter as we are poor farmer and cannot pay huge amount of bill erroneously raised by the department and now they are turning deaf ear towards our bonafide request.
I hope that you will resolve this matter by giving me relief to calculate the bill as per agricultural code and not as per commercial code with retrospctive effect.
Was this information helpful? |
Chadravatika complex