[Resolved]  Supertech Builders — Launch of Additional Tower at Livingston at NH-24

Hi,
I had booked a flat in Supertech Livingston project at Crossings Republik. I had paid PLC charges related to Floor, East/Park, club Facing appartment. Now this builder has launch a new project "Glaxy Tower" on the green area/ park within the same premise thus reducing the park area. This tower as per there latest map now stand infront of our Gallery thus leaving no space to so called Park Facing.
I have booked in this project in 2007 and since than this project has been modified a lot. Earlier they promised 750 flats and now with this launch the number of flats have been increased to 1500. Moreover they have not updated the old allotees about this launch of new towers. With this launch I and many other who have booked in initial time feels cheated and let down.
Is there a way this greed of builders can end, they dont want to leave a single piece of land vacant just wanted to earn as much as possible by giving false promises.

Hope some one here can take this issue
Thanks
Was this information helpful?
No (0)
Yes (0)
Aug 14, 2020
Complaint marked as Resolved 
 
25 Comments

Comments

I have booked flat in Supertech but supertech is fraud, not reliable at all.They cheated us.So I request you that dont book flat in supertech, plz dunt waste your precious time and money in booking flat in Supertech, even they are not attained their customers in their office properly very poor customer service
Hi All,

Please stay away from Supertech. These people are cheats. I have booked a flat in Livingston. Now they have sent a letter to me for possession after 27months of delay. And instead of feeling ashamed these craps has put penalty on me for late payment where as there was delay from Supertech side providing the papers to the bank. While booking I had opted for Covered parking and there was no mention of small car & big car. Now they are asking for another Rs50, 000/- for converting it o big car parking where as it was not as an option while booking in 2009.

Please do not go to Supertech. For them once the customer has paid the money he will be treated as a dog (Customers are like God- for these people it is just opposite).The people dealing with customer are very rude. One Mr Anil Kapoor is there who is handling the Livingston project. He has done PHD in behaving rudely with customer.

Please stay away.

Regds

Manoj
From: EmeraldCourt ResidentsWelfare <[protected]@yahoo.in>
To: "B. V. Rai Singhani" <bv.[protected]@jalindia.co.in>
Date: [protected]:35
Subject: Fw: Urgent Message from our President


On Monday, 28 July 2014 9:53 PM, EmeraldCourt ResidentsWelfare <[protected]@yahoo.in> wrote:


Dear Residents:
We have sent you two emails clarifying ECO RWA's position on Col Sahay's cunning letter and exposing the lies that Mr R K Arora is spreading in the media, mainly Hindustan Times.
ECO RWA wants to give you the facts in brief:
1. We have raised the following deficiencies inside our society with the NOIDA Authority:
Fire Safety: Access of Fire Tender & Fire Escape Staircase,
Structural Safety of Beams & Columns,
Seepage in Flats & Basement,
Internal Roads,
Basement Flooring (VDS), and
External Plastering and quality of Paint.
1. Mr Arora and Col Sahay are spreading fear that because of cancellation of Fire NOC, NOIDA Authority may cancel the occupation certificate. The fact is that NOIDA is looking at ways to get all the above work done and bill Supertech and take strong action against Supertech.

2. Since Supertech is failing at all levels, they are dividing residents in their last attempt by creating panic amongst the residents so that they get some relief from the pressure from ECO RWA.

3. Col Sahay is even trying to talk to some of our residents to get a letter signed and produce before NOIDA Authority to get some relief from them in favour of the Builder.

We request that you do not fall in this trap and do not sign any papers. If you need any further clarification please visit ECO RWA office. We will be having meeting of all the residents soon to answer all your questions.

With Regards,
UBA Teotia
President
Hon'ble Sir,
Request for necessary help on instructing for Immediate investigation against below mail considering Lifie of 500 Families staying in complex under danger because of cancellation fire Noc on 17.06.2014 & Fake structure certificate .
It is further to inform Mr Jaiveersingh S/O Mr Raghubeersingh authorised representative Of Supertech Ltd having regd office at 1114, Hemkunt Chambers 89, Nehru place, New Delhi-110019 & office at Plot B-28/29, Noida 58 is enged in money extraction, harassment and mental torture attempts he is sending E.Mails through Legal Department, Supertech Limited
Supertech House, B 28-29, Sector 58, Noida
Ph.[protected] Ext-278
Fax[protected]
Request for immediate criminal investigation against him.
It is further to inform that I have received 8 harassment SMS messages from tel no [protected] from 6.02 PM onwards .
Matter has been brought in the knowledge of Mr Pradeep Kumar SHO phase 2, MNO[protected], Mr Mishra [protected] & SSP through SMS request for immediate investigation.
Regards,
B.V.Raisinghani
Emperor-1, 902,
Supertech Emerald Court,
Noida-201304
MNo-[protected]


----- Forwarded by bv.raisinghani/JALCERT on[protected]:04 -----

From: bv.raisinghani/JALCERT
To: [protected]@noidapolice.nic.co, cp.[protected]@nic.in, [protected]@noidaauthorityonline.com, [protected]@noidaauthorityonline.com, [protected]@yahoo.com, Shrikant Sharma <sk.sharma.[protected]@gmail.com>, Sham Kumar <[protected]@gmail.com>
Cc: A K Jain <ak.[protected]@supertechlimited.com>, Sadanand Byakod <sadanand.[protected]@supertechlimited.com>, R K Arora <[protected]@supertechlimited.com>, "U.B.S. Teotia" <[protected]@gmail.com>, EmeraldCourt ResidentsWelfare <[protected]@yahoo.in>, Baldev Oberoi <baldev.[protected]@gmail.com>, Vashisth Sharma <[protected]@yahoo.com>, "[protected]@noidaauthorityonline.com" <[protected]@noidaauthorityonline.com>, "[protected]@gmail.com" <[protected]@gmail.com>, "[protected]@sansad.nic.in" <[protected]@sansad.nic.in>, "[protected]@ndtv.com" <[protected]@ndtv.com>, "[protected]@noidaauthorityonline.com" <[protected]@noidaauthorityonline.com>, "[protected]@nic.in" <[protected]@nic.in>, "cp.[protected]@nic.in" <cp.[protected]@nic.in>, "[protected]@noidaauthorityonline.com" <[protected]@noidaauthorityonline.com>, "[protected]@noidaauthorityonline.com" <[protected]@noidaauthorityonline.com>, "[protected]@noidaauthorityonline.com" <[protected]@noidaauthorityonline.com>, "[protected]@yahoo.com" <[protected]@yahoo.com>, "[protected]@nic.in" <[protected]@nic.in>, "[protected]@timesgroup.com" <[protected]@timesgroup.com>, "[protected]@ibnkhabar.com" <[protected]@ibnkhabar.com>, "[protected]@amarujala.com" <[protected]@amarujala.com>, "[protected]@mid-day.com" <[protected]@mid-day.com>, "[protected]@sansad.nic.in" <[protected]@sansad.nic.in>, "[protected]@sansad.nic.in" <[protected]@sansad.nic.in>, "[protected]@gmail.com" <[protected]@gmail.com>, "[protected]@pmo.nic.in" <[protected]@pmo.nic.in>, "[protected]@gmail.com" <[protected]@gmail.com>, "[protected]@ndtv.com" <[protected]@ndtv.com>, "rajdeep.[protected]@network18online.com" <rajdeep.[protected]@network18online.com>, Tandan RWA <[protected]@gmail.com>, "rakesh.[protected]@supertechlimited.com" <rakesh.[protected]@supertechlimited.com>, "[protected]@gmail.com" <[protected]@gmail.com>, "[protected]@nic.in" <[protected]@nic.in>, "[protected]@noidapolice.nic.co" <[protected]@noidapolice.nic.co>, Jeevan.[protected]@hindustantimes.com, [protected]@yahoo.com, [protected]@yahoo.com, Vikas Tyagi Shopprix <[protected]@supertechlimited.com>, "Rajnish Kr. Singh [Legal]" <rajnish.[protected]@supertechlimited.com>, Vinoo Goyal <[protected]@gmail.com>, RAVI BAJAJ <[protected]@gmail.com>, shri kant sharma <[protected]@yahoo.co.in>, [protected]@Petrofin <[protected]@petrofin.com>, [protected]@gmail.com
Date: [protected]:35
Subject: FIR AGAINST SUPERTECH PROJECT DIRECTOR MR A.K.JAIN AND LIASION OFFICER MR TYAGI FOR ATTEMPT TO MAN HANDLE AND THREAT TO MURDER DURING VISIT OF NOIDA OFFICIALS TO SITE WHILE INSPECTING AND EXPLAINATION OF SERIOUS NON COMPLIANCES BELOW EMPEROR-1, SUPERTECH EMERALD COURT, SECTOR -93 A, NOIDA-201304, time of incident around 12.15 hrs on Dec 12, 2013


Hon'ble SSP,
NOIDA

HON'BLE COMMISSIONER OF POLICE,
DELHI

In furtherance to below mail full name of the liaison person of Supertech, Main accused involved in the matter is Mr Vikas Tyagi.
Mr Vikas Tyagi, during current incident out burst has informed links with Criminals in the Bhangel area.

So, in case of any body injury/ any further attempt of Murder/ Murder of me or any of my family member thorough investigation of Involvement of Mr Vikas Tyagi & his criminal links with Bhangel Area criminals should be investigated and he should not be allowed to leave city till complete investigation has been conducted, Immediate necessary alert on his movement watch, tel conversations may kindly be initiated and he should not be allowed to leave city till the time investigation is completed.

Further clarification on the Death Enclosure constructed under the Emperor-1 are as under:
1.The same has not been constructed with the approval of RWA, matter in detail has been replied by ECO RWA VIDE E.MAIL DATE 15.12.2013 transmitted at 22;25, neither any written approval from the
noida Authorities is their.
2.Two storage rooms constructed within the enclosure are convenient place to store dangerous material /hide out place for criminals/terrorists.
3.Partition wall and Glasses doors are obstruction for obstruction free movement in case of accident.
4.Noida authorities in all their show cause notices have requested for the removal of the wall.
5.Non removal of partition wall is one of the main reason for Parking conjunctions.

REQUEST FOR IMMEDIATE NECESSARY INSTRUCTIONS FOR THE REMOVAL OF DEATH TRAPS CONSTRUCTED IN THE OFFSET AREA, REMOVAL OF PARTITION WALL AND REMOVAL OF ROOMS CONSTRUCTED WITHIN ENCLOSURE.

During investigation it is suggested to Visit RWA office for going through all the records in the matter .

Request for immediate Investigation in the matter & providing protection to me and my family members,
With respect, regards and the best wishes
B.V.Raisinghani
Emperor-1, 902

----- Forwarded by bv.raisinghani/JALCERT on[protected]:04 -----

From: bv.raisinghani/JALCERT
To: [protected]@noidapolice.nic.co, cp.[protected]@nic.in, [protected]@noidaauthorityonline.com, [protected]@noidaauthorityonline.com, [protected]@yahoo.com, Shrikant Sharma <sk.sharma.[protected]@gmail.com>, Sham Kumar <[protected]@gmail.com>
Cc: A K Jain <ak.[protected]@supertechlimited.com>, Sadanand Byakod <sadanand.[protected]@supertechlimited.com>, R K Arora <[protected]@supertechlimited.com>, "U.B.S. Teotia" <[protected]@gmail.com>, EmeraldCourt ResidentsWelfare <[protected]@yahoo.in>, Baldev Oberoi <baldev.[protected]@gmail.com>, Vashisth Sharma <[protected]@yahoo.com>, "[protected]@noidaauthorityonline.com" <[protected]@noidaauthorityonline.com>, "[protected]@gmail.com" <[protected]@gmail.com>, "[protected]@sansad.nic.in" <[protected]@sansad.nic.in>, "[protected]@ndtv.com" <[protected]@ndtv.com>, "[protected]@noidaauthorityonline.com" <[protected]@noidaauthorityonline.com>, "[protected]@nic.in" <[protected]@nic.in>, "cp.[protected]@nic.in" <cp.[protected]@nic.in>, "[protected]@noidaauthorityonline.com" <[protected]@noidaauthorityonline.com>, "[protected]@noidaauthorityonline.com" <[protected]@noidaauthorityonline.com>, "[protected]@noidaauthorityonline.com" <[protected]@noidaauthorityonline.com>, "[protected]@yahoo.com" <[protected]@yahoo.com>, "[protected]@nic.in" <[protected]@nic.in>, "[protected]@timesgroup.com" <[protected]@timesgroup.com>, "[protected]@ibnkhabar.com" <[protected]@ibnkhabar.com>, "[protected]@amarujala.com" <[protected]@amarujala.com>, "[protected]@mid-day.com" <[protected]@mid-day.com>, "[protected]@sansad.nic.in" <[protected]@sansad.nic.in>, "[protected]@sansad.nic.in" <[protected]@sansad.nic.in>, "[protected]@gmail.com" <[protected]@gmail.com>, "[protected]@pmo.nic.in" <[protected]@pmo.nic.in>, "[protected]@gmail.com" <[protected]@gmail.com>, "[protected]@ndtv.com" <[protected]@ndtv.com>, "rajdeep.[protected]@network18online.com" <rajdeep.[protected]@network18online.com>, Tandan RWA <[protected]@gmail.com>, "rakesh.[protected]@supertechlimited.com" <rakesh.[protected]@supertechlimited.com>, "[protected]@gmail.com" <[protected]@gmail.com>, "[protected]@nic.in" <[protected]@nic.in>, "[protected]@noidapolice.nic.co" <[protected]@noidapolice.nic.co>, Jeevan.[protected]@hindustantimes.com, [protected]@yahoo.com, [protected]@yahoo.com, Vikas Tyagi Shopprix <[protected]@supertechlimited.com>, "Rajnish Kr. Singh [Legal]" <rajnish.[protected]@supertechlimited.com>, Vinoo Goyal <[protected]@gmail.com>, RAVI BAJAJ <[protected]@gmail.com>, shri kant sharma <[protected]@yahoo.co.in>, [protected]@Petrofin <[protected]@petrofin.com>, [protected]@gmail.com
Date: [protected]:25
Subject: FIR AGAINST SUPERTECH PROJECT DIRECTOR MR A.K.JAIN AND LIASION OFFICER MR TYAGI FOR ATTEMPT TO MAN HANDLE AND THREAT TO MURDER DURING VISIT OF NOIDA OFFICIALS TO SITE WHILE INSPECTING AND EXPLAINATION OF SERIOUS NON COMPLIANCES BELOW EMPEROR-1, SUPERTECH EMERALD COURT, SECTOR -93 A, NOIDA-201304, time of incident around 12.15 hrs on Dec 12, 2013


Hon'ble SSP,
NOIDA

HON'BLE COMMISSIONER OF POLICE,
DELHI

Purpose of request to Hon'ble SSP, NOIDA is happening of incidence around 12.15 hrs on Dec12, 2013 BELOW EMPEROR-1, SUPERTECH EMERALD COURT, SECTOR -93 A, NOIDA-201304 & to HON'BLE COMMISSIONER OF POLICE, DELHI is because builder Head Office is at Nehru place, New Delhi, request for thorough investigation of the previous mails pending for investigation & current incident as builder & his officials have inspired confidence for no action till date, Details of the current incident are as under :
Noida Authority officials from CAP, HOUSING AND MAINTENANCE DEPARTMENT visited site on Dec 12, 2013 around 11 AM for verification of facts related to serious Non compliances, continuing of Illegal Construction of Apex & ceyane Towers, Illegal occupancy, encroachment, destruction of public road, dumping of construction material in park area & Builders Acts requiring Investigation under THE PREVENTION OF TERRORISM ACT, 2002 as they are seriously endangering life of more than 450 Families staying in seriously non compliant, accident prone Supertech Emerald court ( Marketed as Dream Project of Builder as Jewel Of Perfection ), Sector-93A, Noida-201304.

First Meeting was held in the Illegally occupied sales office of the builder in the Ground Floor of Illegal Apex Tower, Gist of discussions is as under :

1.Noida officials in spite of being aware and information available in the record of the Illegal occupancy did not raise any objection on holding of the meeting there.
2.Important References:
a.Complaint filed by 56 Residents with Police and information received through RTI, INVESTIGATION OFFICER CONFIRMING SERIOUS IRREGULARITIES AND CONFIRMING CHEATING AND OTHER CHARGES FOR WHICH FURTHER ACTION FROM SSP IS STILL PENDING
b.FIR filed by residents - FOR WHICH ACTION FROM SSP IS STILL PENDING
c.Media report on Accident in the complex and cancellation of Fire NOC.
d.All correspondences done by Undersigned, other residents & RWA with Supertech., Noida and other Administrative authorities.
e.Special ref to Copy of letter dated Sept 11, 2013 written by RWA to CEO.
f Final Show cause Notice date Aug 6, 2013 Issued to builder and Fire committee report.
g.Issue of fake certificate.
h.Allhabad High court judgement regarding U.P.Apartment act, possession & occupancy certificate.

3.During review of final show cause notice requirement it was observed that not even a single requirement has been fulfilled by the builder although illegally extended compliance period has expired on 15.11.2013

4.RWA members With ref to Notification ref no 2213/[protected]N./85 dated Nov 10, 2010 issued in Supersession of Notification ref no 6435/[protected]N./85 dated DEC 05, 2006 asked Noida officials
Why provisions under Chapter 2 Under pra 5 & 6 Informing requirements pertaining to Building permit and layout plan .Under para 12 provisions related to Scrutiny of building permit have not been followed, even most important provision Under para 20 related to issue of Occupancy certificate have not been followed, which none of the Noida official on visit could explain, providing conclusion that these provisions have just remained in the files of concerned officials as all mandatory compliance related requirements to be fulfilled by builder have been totally ignored.
5.No where In the above referred Notifications or NBC code as adopted by Noida authorities provisions related to Space Frame and relaxation of fulfilment of mandatory compliance requirement considering Interconnection between group of towers being referred by Builder & Noida authority as Building Block has been provided, Noida authorities officials were asked to provide reference which they could not provide
6.Noida authority while providing reference to Above referred to certificate obtained by Builder from the Associate professor of Roorki, which has been established to be a fake certificate.
7.Noida authorities have ignored Mandatory requirement of submission of NOC from FIRE and Environment by builder while giving various permits/ amendments to permits and issue of partial completion certificate, reason for same also could not be explained by VISITING Noida officials.

8.CFO Noida vide letter ref 881 DATED APRIL 24, 2012 HAVE INFORMED HIS OBSERVATION ON SERIOUS NON COMPLIANCE RELATED TO DISTANCE BETWEEN TWO BUILDING BLOCKS WHICH TILL DATE HAS NEITHER BEEN EXPLAINED NOR REPLIED BY NOIDA AUTHORITIES, Mr Mukesh of CAP department informed that he shall look into this and provide reply.

9.During course of discussions RWA officials explained that periodic meeting held with Supertech officials are to provide feed back on the quality of execution & expedite execution of compliances & no where intention of such meetings is to provide dilution to compliance requirement or accept delay in execution, RWA MEMBERS REPEATEDLY EMPHASIZED URGENCY OF REMOVAL OF DEATH TRAP CONSTRUCTED IN THE OFFSET AREA, however builder by using RWA meeting selective references and correspondences, ignoring subsequent correspondences tried to justify non removal, builder's act through project director to justify to avail dilution and delay is highly objectionable & illegal as Notification ref no 2213/[protected]N./85 dated Nov 10, 2010 issued in Supersession of Notification ref no 6435/[protected]N./85 dated DEC 05, 2006 clearly mentions that FINAL responsibility of execution in compliance with NBC NORMS AS ADOPTED BY NOIDA AUTHORITIES IS THE RESPONSIBILTY OF SITE PROJECT/TECHNICAL DIRECTOR OF THE BUILDER, AND APEX COURT IN VARIOUS JUDGEMENTS HAVE REFERRED THAT NO AUTHORITY HAVE GOT POWER TO DILUTE WRITTEN DOWN MANDATORY PROVISIONS, however Project Director ignoring all these written down provisions and Apex court judgements have continued with serious non compliances putting in danger life of more than 450 families staying in the complex relying on strength of false certificates obtained from the concerned authorities and have further derived strength from Noida and other authorities for not taking action according to provisions laid down in the relevant notifications as per law and working per their dictates.

After meeting Noida Authorities officials made a visit and made following observations:

1.Encroachment of Noida drain and footpath, continuing of Illegal construction of Apex And Ceyane Towers, illegal visitor parking outside complex as Visitor parking as Per NBC provisions have not been provided within the complex, spoiling of road, destruction of park surrounding and dumping of construction Mateial, Mr Mukesh Goyal of Noida authorities took photographs of these.

2.Within complex Noida Authorities observed continuation of car parking in the offset area, not removal of death trap shade from the offset area, Immediately after entry to basement, MR MUKESH COMMENTED THAT IT APPEARS BASEMENT OF A VERY VERY OLD BUILDING AFTER HAVING FIRST GLIMPSE OF HORRIBLE CONDITION OF BASEMENT WITH DIRTY FOULING SMELL COMING FROM TOILET, spillage of water all around and adhock installation of sprinkler pipes without approved hydrology plan .
3. Team was taken Below Emperor- 1 to show continuation of seriously non compliant situation, while explanation was being made showing two storage room construction within the enclosure and non removal of partition wall, MR TYAGI LIASION PERSON ASKED ME TO STOP AND NOT TO UTTER A WORD RELATED TO NON COMPLIANCE, FOLLOWED BY MR A.K.JAIN, both of them continued to shower their anger on me and attempted to Man handle me, but they were hold by colleague residents however continued with their threats to man handle and Murder me.
4.At this juncture My colleague resident Mr S.K.Sharma advised me to leave the site to ensure my protection from manhandling and outbursts from Mr Tyagi & MR A.K.Jain, I followed his advice and left site and on reaching office immediately sent the E.Mail to all concerned.

Request for thorough invetigation in the matter, visit site for physical verification of the information provided above, arrange recording of the statement of all concerned & conduct lie detection test at the earliest and to provide protection to me and my family members .
In view of the above incident, its' very important to know what report the Noida Authority officials have prepared. It might have been the pre-planning of Supertech in connivance of Noida Authority Officials to create such scene & then walk away & finally make such report that goes against RESIDENTS.

So, its' important to get in touch with Noida Authority Officials at the earliest, find out the facts & record their statements pertaining to varification & incident, concerned Noida officials names and Mobile nos are given below:
1.Mr Mukesh Goyal- [protected]
2.Mr A.K.Mishra-[protected]
3.Mr Manoj Rai-[protected]
4.Mr.Deo Pujari-[protected]
5.Mr M.C.Tyagi-[protected]
I CONFIRM THAT ABOVE CONTENTS ARE TRUE AND HAVE BEEN TRIED TO BE EXPLAINED TO BEST OF MY ABILITY, I AM PREPARED TO RECORD MY STATEMENT BEFORE JUDICIAL MAGISTRATE .

Expecting fair investigation in the matter.


One of the most tortured, harassed resident having received
three illegal legal notices, various threats including murder threat from the builder
& Now from Project Director & his liasion person
With respect, regards and the best wishes
B.V.Raisinghani

Emperor-1, 902

C.C;

Hon'ble CEO

Hon'ble ADG

Hon'ble Director ( Environment)

Hon'ble Commissioner Of police

Hon'ble CM (U.P)

Hon'ble PM

REQUEST FOR ORDERING THOROUGH INVESTIGATION IN THE MATTER AND PROVIDING PROTECTION TO ME AND MY FAMILY MEMBERS
Hi All,

I have also booked a flat in Supertech Livingston F Tower, however the builder has delayed the posession by over 1.9 year. i think we should contact all the buyer and collectively complain about the possession as it seems that they will not be giving possession before december.
from last one year every month supertech GM-contruction of Livingston says that it will take another three months. last year, we could not save tax because of not getting possession and this year also supertech is trying to the same.

the buyers of supertech livingston should join hands and complain against them together.

please contact - [protected]@gmail.com

Post your Comment

    I want to submit Complaint Positive Review Neutral Comment
    code
    By clicking Submit you agree to our Terms of Use
    Submit
    Supertech
    customer care contacts
    Customer satisfaction rating Customer satisfaction rating is a complex algorithm that helps our users determine how good a company is at responding and resolving complaints by granting from 1 to 5 stars for each complaint and then ultimately combining them all for an overall score.
    Read more
    29%
    Complaints
    627
    Pending
    0
    Resolved
    177
    Supertech Phone
    +91 12 0457 2600
    +91 11 4161 9836
    Supertech Address
    Supertech House, B 28-29, Sec-58, Noida, Uttar Pradesh, India - 201307
    View all Supertech contact information