Comments
Date:19.05.11
consumer id:[protected]
consumer no.:B093385
Sub.:-Power Failure.
Unable to connect your phone due to some problem. It is very urgent to connect power supply.
consumer id:[protected]
consumer no.:B093385
Sub.:-Power Failure.
Unable to connect your phone due to some problem. It is very urgent to connect power supply.
Customer satisfaction rating Customer satisfaction rating is a complex algorithm that helps our users determine how good
a company is at responding and resolving complaints by granting from 1 to 5 stars for each
complaint and then ultimately combining them all for an overall score.
Read more
Read more
17%
Complaints
1380
Pending
0
Resolved
239
+91 33 2359 8128
Vidyut Bhawan, Block B, 2nd Floor, Salt Lake City, Sech Bhawan, Kolkata, West Bengal, India - 700091
Meter box of C3 type, M1 model, block =13 Building Two Phase (2Ø) not
Working against Three phase (3Ø).
Sir,
We are your Esteemed customers of C3 M1 = 13 Building with 16(sixteen) flats at CMDANAGAR which were constructed by Kolkata Metropolitan Development Authority at MOHANPUR.
We have come to know from reliable sources that above mentioned Power cable Laid was for Main power supply at C3 M1 = 13 Building for three phases only, but two phases of the same power cable are not working and only one phase of the power cable is in proper condition and this has occurred due to the mal-handling of the concerned people.
So you are requested kindly to give the attention of the matter and do some positive work to replace the Existing Power Cable because now Total 16 Nos. flat of C3 M1 = 13 Building are running on one Single Phase, and due to slight variation of Amperage, Fuse is blown-off and Power for C3 M1 = 13 Building remises totally in OFF condition, This Fuse box is handled by WBSEDCL people. Now you can think how great problem we are facing. We have been suffering a lot for lengthy load shedding everyday [daytime-5/6 times-approx. 6/7 hours, after evening at least 2 times-each-2 hours / 2.5 hours at a stretch, this continues even in the early hours of the day i.e. between 4 am to 8 am also ].Leading life in such a way has been realling killing...What is the solution? Without attention WBSEDCL people load shedding continues.Its time taken every day.Early replace of the power cable is highly appreciable.
Thanking you, With Regards,
PRADIP SARKAR
Consumer No.A154436
Flat Owner C3M1=13, #1321 2nd floor
CMDANAGAR, Barrack pore Housing Complex
K O L K A T A – 7 0 0 1 2 1
Copy to,
The Chairman
West Bengal State Distribution Company Limited
Vidyut Bhavan
Block - DG
Sector-II, Bidhannagar
Kolkata - 700091